Basic Charges
1. Mobilisation RM 743.00
2. Preparation of pre-comp plans RM 20.00 / lot subject to a minimum charge of RM400.00 / A1 size sheet
3. Preparation of QT plans RM 30.00 / lot
4. Azimuth control RM 2.00 / m
5. Height control RM 464.40 / km
Engineering Survey Charges
1. Demarcation survey RM 2.00 / m
2. Re-establishment of old boundary marks RM 170.00 / mark
3. Establishment of TBM RM 150.00 / TBM
4. Topographical & detail survey RM 300.00 / acre
5. As-built survey RM 300.00 / acre
6. Tree survey RM 10.00 / tree
7. Strip survey (longitudinal profiling) RM 1000.00 / km
8. Underground survey RM 2.50 / sq m